All new connections to Metrowater's network are liable for the Network Upgrade Charge. This includes increasing the size of a water meter to cater for increased demand from a property or adding significant demand to an existing meter.
Some connections require backflow devices, please check this requirement.
To make an application for a new water connection (metered, fire hydrant / connection or new watermain) download the new connection pack.